But I would really like to have the boards for Calamity done for Tacticon which takes place on Labor day weekend. I figure I better get started with something to show a little progress. In this case I have some issues I need to solve one how the support for the boards will be built and how everything will go together. Since I want to include both a small creek or river (so I can build at least one bridge!) as well as a slope some planning is definitely in order. The best way to visualize in three dimensions is to build a model. So that's what I'll build first a model of the supporting structure for the boards. For this particular model I decided I would go with 1/8" = 1" so 1 1/2 measured inches is equal to a foot. Its easy to measure out and it won't be huge, but will be big enough to show some detail.
I'm building this out of strip styrene from Evergreen. The base supports will be cut from 1x2 so in my chosen scale these will be cut from 1/8"x1/4" strips. Since I need to show some change in elevation as well, the outside will be made from 1/4" plywood which scales out to 1/32" (again my chosen scale of 1/8 makes the measurements easy). Of course they don't sell plastic strip like this so what I actually purchased was pack 189 (.125x.250) and a package of sheet styrene 9030 (.030 thick).
This is what I ended up with:
Marking out 16" centers for the center supports |
All three 2'x4' sections finished. They are pretty close to being identical and they will certainly work for modeling purposes |
On the left side its 5" in height on the left its 4" in height so the longer side pieces will have be cut at an angle to match the ends. |
So that's part 1 hopefully there won't be such a long gap in posts in the coming months.