As always the pictures with a few comments should explain everything that I did, well at least when I remembered to take pictures.
I cut the siding to fit and glued it into place right over the window openings. |
I cut the windows out from the backside. Note that the sides of this piece still need to be trimmed a bit. |
Here the process is repeated on the freight door side |
A construction photo, this is the front of the bay window on the front of the building. |
Another in progress photo |
Front bay window. The clapboard is in place, windows have been re-cut the vertical planks have trim on both sides. |
Door to the waiting room on the front side |
Door to the waiting room, trackside |
The windows into the freight/baggage room |
The sides of the bay windows ready to go |
Hard to see in this picture but the upper trim piece has been added to add separation between the clapboards and the vertical planks of the second story. |
Second story vertical planks, freight door side |
Second story vertical planks, waiting room side |
Testing fitting the front elevation. All the vertical edge trim has been added as well as the board and batten siding at the top of the bay window and both ends. |
And from the waiting room side. The board and batten really shows nicely here as does the vertical trim pieces. |