The Missing Box, found in plain site of course. |
That was a pretty big box for this small package. Wrapped in bubblewrap and filled in with shipping peanuts. I hate shipping peanuts. |
Prepping the windows and doors |
Primed windows and doors |
And while the primer was drying I applied the tan wallpaper to the interior walls of the main floor. Pulled out my weights to make sure they dried nice and flat. |
My weathering formula applied to the exterior walls |
Some more exterior walls. Don't be considered with even coverage since its going to be covered with paint. |
Window with the weathering applied |
I finally get to test fit the windows and doors. You can see here that I will need to lengthen the doors to fit the actual size of the door opening. |
More windows and doors being test fitted. |
And I was able to build the triple window that's on the trackside of the station. |